Secondary Roof Drain Code Requirements

Roof Drainage 2016 05 11 Plumbing Mechanical

Roof Drainage 2016 05 11 Plumbing Mechanical

Https Www Cityofpaloalto Org Civicax Filebank Documents 17682

Https Www Cityofpaloalto Org Civicax Filebank Documents 17682

Chapter 11 Storm Drainage California Plumbing Code 2016 Upcodes

Chapter 11 Storm Drainage California Plumbing Code 2016 Upcodes

Chapter 28 Building Regulations

Chapter 28 Building Regulations

Roof Drainage Reference Page Roof Online

Roof Drainage Reference Page Roof Online

Http Docserver Nrca Net Technical 9862 Pdf

Http Docserver Nrca Net Technical 9862 Pdf

Http Docserver Nrca Net Technical 9862 Pdf

Secondary emergency roof drain systems shall be sized in accordance with section 1106 based on the rainfall rate for which the primary system is sized.

Secondary roof drain code requirements.

It s very short and to the point. The minimum slope the code allows is in 12 in. When a secondary roof drainage system is installed it shall discharge independent of the primary building storm system and shall terminate a minimum of 18 above grade in an area that will be visible to the people who occupy the building. Scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by section 1101 7.

Roof system provides for positive drainage. If they are used for secondary drainage then they should be a minimum of 2 inches above the roof level and a maximum of 4 inches above the roof level. Secondary emergency roof drains or scuppers are required according to ipc to prevent a rainwater build up. Building code 2015 of wyoming 15 roof assemblies and rooftop structures 1503 weather protection 1503 4 roof drainage 1503 4 1 secondary emergency overflow drains or scuppers.

See section 1107 for yourself. This is completed using a plumbing calculation. Exception 1 of section 1511 1 states existing roofs do not have to meet the requirements of the code if positive drainage is provided. Ibc s secondary roof drainage requirement first was added in ibc 2009.

The rationale for not requiring secondary drainage is that if positive drainage is provided that is adequate to drain the roof. Secondary drainage was not required with ibc s previous editions. Prior to the 1994 upc the only mention of secondary roof drains is a listing of the materials to be utilized for over flow drains in the 1994 upc rainwater systems was included as appendix d to the code. The uniform plumbing code followed a similar path to incorporating secondary drainage requirements.

This system shall be compliant with all federal state and local codes. We would like to show you a description here but the site won t allow us. Part a d1 1 d notes that. Where roof drains are required secondary emergency overflow roof drains or scuppers shall be provided where the roof perimeter construction.

1511 1 roof assemblies and rooftop structures general.

Chapter 11 Storm Drainage Nyc Plumbing Code 2014 Upcodes

Chapter 11 Storm Drainage Nyc Plumbing Code 2014 Upcodes

Secondary Drainage And Ponding Requirements In The Ibc And Iebc Iibec

Secondary Drainage And Ponding Requirements In The Ibc And Iebc Iibec

Secondary Roof Drainage An Essential Of Good Design 2007 08 01 Pm Engineer

Secondary Roof Drainage An Essential Of Good Design 2007 08 01 Pm Engineer

Https Steeljoist Org Wp Content Uploads Sji Ponding Webinar Final 021318 1 Handout Pdf

Https Steeljoist Org Wp Content Uploads Sji Ponding Webinar Final 021318 1 Handout Pdf

Source : pinterest.com